Projects

Project Report of waterways

Sl.No

Details of Project Report of waterways

Estimated cost for the proposed project report (in crores)

1.

Kodibag to Kadra along Kali river coast of Karwar Taluka, Uttara Kannada, District.

7.28
2.

Inland Water ways along the Gangolli (Pancha Gangaovali) rivers of Kundapura Taluka of Udupi District.

12.23
3.

Old Mangalore coast to Gurupur Netravati river coastal area of Mangalore taluka of Mangalore District.

6.77
4.

Waterways in Back-water area created by construction Almatti dam across “Krishna” river in Bagalkot taluk of Bagalkot District.

11.75
5.

Anandagiri in Beedarhalli, Hooballi to Beeramballi of Back water area of Kobini river reservoir in Hegda Devanakote Taluka of Mysore District.

2.91
6.

Inland Water ways along Udyavar river upto Malpe Port in Udupi taluk of Udupi District.

7.14
7.

Along Sharavati river coast from Honnavar to Gerasoppa in Honnavar taluka of Uttara Kannada District.

10.56
TOTAL 58.64

For Dredger and other materials – Estimated cost Rs.

17.22

Proposal Total Estimated cost Rs.

75.86

en_GBEnglish (UK)